Data center

RELIABLE POWER INFRASTRUCTURE FOR DATA CENTER CAMPUSES

We design dedicated power generation systems that enable data center developers to secure resilient energy supply and accelerate project deployment.

Data center

RELIABLE POWER INFRASTRUCTURE FOR DATA CENTER CAMPUSES

We design dedicated power generation systems that enable data center developers to secure resilient energy supply and accelerate project deployment.

Data center

RELIABLE POWER INFRASTRUCTURE FOR DATA CENTER CAMPUSES

We design dedicated power generation systems that enable data center developers to secure resilient energy supply and accelerate project deployment.

Data center

RELIABLE POWER INFRASTRUCTURE FOR DATA CENTER CAMPUSES

We design dedicated power generation systems that enable data center developers to secure resilient energy supply and accelerate project deployment.

Our capacity

Feasibility Studies​

Detailed Design​

Reliability Studies

PM/CM​

Our capacity

Feasibility Studies​

Detailed Design​

Reliability Studies

PM/CM​

Our capacity

Feasibility Studies​

Detailed Design​

Reliability Studies

PM/CM​

Our capacity

Feasibility Studies​

Detailed Design​

Reliability Studies

PM/CM​

The Redtree
solution

Dedicated power infrastructure

Reliable onsite generations​

Accelerated deployment of power systems

Redundancy strategies​

Owner’s engineering and PMC

Commissioning and energization support

Key Projects

Data Center Site Development. Uruguay

Led due diligence, land acquisition, and permitting for future data center sites — assessing power, water, connectivity, and regulatory feasibility.

$700M Hyperscale Data Center. Uruguay

Full lifecycle delivery for a $700M hyperscale data center — from environmental permitting and owner representation, through Engineer of Record design development, to on-site construction management today.

12,500 sqm Government Data Center. Uruguay

Conceptual design through commissioning for a 40,000-server facility — Uruguay's largest data center and a regional benchmark until 2019.

40MW Data Center Site Due Diligence. Uruguay

Full site assessment — power, water, connectivity, environmental risk, and code compliance — for a data center scalable from 40MW to 60MW.

280,000 SF Data Center Structural Engineering. Leesburg, VA

Structural engineering and BIM for design development and construction documents, including foundation loads, drilled pier design, and slab-on-grade.

Hyperscaler Landing Station Due Diligence. Chile

Comparative due diligence of two alternative sites for a data center landing station — power, water, connectivity, and regulatory feasibility.

Key Projects

Data Center Site Development. Uruguay

Led due diligence, land acquisition, and permitting for future data center sites — assessing power, water, connectivity, and regulatory feasibility.

$700M Hyperscale Data Center. Uruguay

Full lifecycle delivery for a $700M hyperscale data center — from environmental permitting and owner representation, through Engineer of Record design development, to on-site construction management today.

12,500 sqm Government Data Center. Uruguay

Conceptual design through commissioning for a 40,000-server facility — Uruguay's largest data center and a regional benchmark until 2019.

40MW Data Center Site Due Diligence. Uruguay

Full site assessment — power, water, connectivity, environmental risk, and code compliance — for a data center scalable from 40MW to 60MW.

280,000 SF Data Center Structural Engineering. Leesburg, VA

Structural engineering and BIM for design development and construction documents, including foundation loads, drilled pier design, and slab-on-grade.

Hyperscaler Landing Station Due Diligence. Chile

Comparative due diligence of two alternative sites for a data center landing station — power, water, connectivity, and regulatory feasibility.

Key Projects

Data Center Site Development. Uruguay

Led due diligence, land acquisition, and permitting for future data center sites — assessing power, water, connectivity, and regulatory feasibility.

$700M Hyperscale Data Center. Uruguay

Full lifecycle delivery for a $700M hyperscale data center — from environmental permitting and owner representation, through Engineer of Record design development, to on-site construction management today.

12,500 sqm Government Data Center. Uruguay

Conceptual design through commissioning for a 40,000-server facility — Uruguay's largest data center and a regional benchmark until 2019.

40MW Data Center Site Due Diligence. Uruguay

Full site assessment — power, water, connectivity, environmental risk, and code compliance — for a data center scalable from 40MW to 60MW.

280,000 SF Data Center Structural Engineering. Leesburg, VA

Structural engineering and BIM for design development and construction documents, including foundation loads, drilled pier design, and slab-on-grade.

Hyperscaler Landing Station Due Diligence. Chile

Comparative due diligence of two alternative sites for a data center landing station — power, water, connectivity, and regulatory feasibility.

Key Projects

Data Center Site Development. Uruguay

Led due diligence, land acquisition, and permitting for future data center sites — assessing power, water, connectivity, and regulatory feasibility.

$700M Hyperscale Data Center. Uruguay

Full lifecycle delivery for a $700M hyperscale data center — from environmental permitting and owner representation, through Engineer of Record design development, to on-site construction management today.

12,500 sqm Government Data Center. Uruguay

Conceptual design through commissioning for a 40,000-server facility — Uruguay's largest data center and a regional benchmark until 2019.

40MW Data Center Site Due Diligence. Uruguay

Full site assessment — power, water, connectivity, environmental risk, and code compliance — for a data center scalable from 40MW to 60MW.

280,000 SF Data Center Structural Engineering. Leesburg, VA

Structural engineering and BIM for design development and construction documents, including foundation loads, drilled pier design, and slab-on-grade.

Hyperscaler Landing Station Due Diligence. Chile

Comparative due diligence of two alternative sites for a data center landing station — power, water, connectivity, and regulatory feasibility.

The Redtree
solution

Item 1 text

Item 2 text

Item 3 text

Item 4 text

Item 5 text

Item 6 text

The Redtree
solution

Item 1 text

Item 2 text

Item 3 text

Item 4 text

Item 5 text

Item 6 text

The Redtree
solution

Item 1 text

Item 2 text

Item 3 text

Item 4 text

Item 5 text

Item 6 text

CONTACT US

We have a lot more to share about our projects and services. Contact us and our specialist will get back to you ASAP. (When we ASAP, we mean it)


CONTACT US

We have a lot more to share about our projects and services. Contact us and our specialist will get back to you ASAP. (When we ASAP, we mean it)


CONTACT US

We have a lot more to share about our projects and services. Contact us and our specialist will get back to you ASAP. (When we ASAP, we mean it)


CONTACT US

We have a lot more to share about our projects and services. Contact us and our specialist will get back to you ASAP. (When we ASAP, we mean it)